Time to do an update. Log Homes, on average, take longer to build than regular stick built houses, so, taking that into account, plus the winter weather, plus the fact the crew consists of two guys and they've both had a couple sick days, means slow progress. Right now, the house has a roof on it, and half of it is shingled. I don't have pics of the shingles, only w/ the one layer of roof on (knotty pine). The first pic is of the 2nd floor, the doorway is the balcony door off the master bedroom. There will be one skylight, and it'll be in Erin's bedroom (which is actually bigger than the master bedroom!). What we plan to do if we have more kids is to put a partition wall in the center of the room and create 2 bedrooms out of it. I love the vaulted ceilings of the 2nd floor, how you see it in the pics is how it'll stay.
Still a long way to go, we're STILL mulling over cabinets and kitchen design, I think we've finally found the guy we want to go with. The HVAC guy and plumber have been at the house, we've got some duct work up and the pipes for the bath/shower and toilets going in. Had to run out to get the shower and tub/shower combo for them to put in this week, and we're researching lighting. I'm pretty stressed out already, and I never want to look at another cabinet again!!
