I have pics somewhere it's just a matter of finding them (I almost started looking for them last nigth but got side tracked).
We started out by digging down so that the pavers would end up level with the driveway they were butting up against. Once we dug down & leveled everything we put down a layer of plastic (I suggest using a different weed barrier as the plastic held too much water that took an extra step later to correct). Then it was time to place the sand (you can use small gravel) & tamp it down. Then the joy of laying & leveling the pavers.
Honestly the majority of our time was spent digging to make the base level.